Diggy

Copper mining

Ore and waste, counted on every shift.

Open-pit copper mines haul ore to the plant or stockpile and waste to the dump, all day. Each load is recorded by truck and material, so the split is known before the survey.

30 minutes • Live walkthrough • No obligation

Copper mining: questions

Can we keep separate stockpiles apart?
Yes. Each stockpile has its own record, and surveys are logged against it. The stock on the ground is checked against what the trucks reported.
Does it help run the shift, as well as report it?
Line-ups put each operator on a machine before the shift starts. The control room then shows the live shift board, and site delays are logged when they happen.
Is it built for the Copperbelt?
It is built for open-pit copper work in Zambia and further afield, with offline mobile apps for remote pits and same-day support on WhatsApp.
Book a demo
Book a demo
Diggy

Book a demo

30 minutes • Live walkthrough • No obligation