Coal mining
Overburden in BCM, coal in tonnes.
On an open-cast coal strip, overburden is paid in BCM and the coal in tonnes. Each shift records the loads by material, with the diesel every machine burned beside them.
30 minutes • Live walkthrough • No obligation
- Overburden BCM and coal tonnes by shift
- Dozing entries against each dozer
- Drill and blast records for each block
- Diesel checked against engine hours