Diggy

Mpumalanga

Built for the Highveld coalfields.

Mpumalanga’s coalfields run on open-cast pits and contractors working for several collieries at once. Each shift’s BCM and tonnes are recorded beside the diesel burned to move them.

30 minutes • Live walkthrough • No obligation

Mpumalanga: questions

Is Diggy built for coal contractors in Mpumalanga?
Yes. It is built for surface contractors on open-cast coal, paid on BCM stripped and tonnes loaded, with each colliery kept as its own site.
We work for more than one colliery. Can we see them together?
Each site keeps its own shift records and machine costs. The owner sees every site in one set of reports, and charge-backs go to the right client.
How quickly can we get a site going?
We take on a limited number of new sites at a time, so every rollout gets our full attention. Speak to us about when your site could start.
Book a demo
Book a demo
Diggy

Book a demo

30 minutes • Live walkthrough • No obligation